Independent SaaS:Not affiliated with GeM, CPPP, or SECI. Direct official NIT links provided for 100% compliance.
Back to Tender Directory
VERIFIED PUBLIC PROCUREMENT NOTICESource: Official SECI / CPPP Portal
4-Point Contractor Executive Checklist
1. Udyam MSME EMD Waiver
100% Cash EMD Exempt
Saves ₹55.80 Lakhs in capital
2. Electrical Licence
Class A Licence Mandatory
High Voltage (HT) Bay work
3. Submission Deadline
Closed / Expired
Closes 10 Nov 2026
4. Official Gazette Source
Official SECI / CPPP Portal
1-Click Original NIT Download
Solar RooftopInstitutional, National•Tender ID: SECI-2026-TN000031

Request for Selection of Solar Power Developers for 11,159 kW Grid-Connected Rooftop Solar PV Projects (RTSPV Tranche-XIV)

SECI (Solar Energy Corporation of India Ltd.)•Renewable Energy Procurement Division
Open official portal — search by tender ID: SECI-2026-TN000031
Source: Official SECI / CPPP Portal (Last verified against official portal: 25 Oct 2026, 06:00 IST)

AI Tender Summary & Extracted Evidence

REQUIRES PRO ACCOUNT
Verified Plain-English NIT Extraction • Preview Mode
Comprehensive procurement scope for Request for Selection of Solar Power Developers for 11,159 kW Grid-Connected Rooftop Solar PV Projec by SECI (Solar Energy Corporation of India Ltd.). Includes detailed technical eligibility breakdown, ALMM solar PV module specifications, and mandatory submission compliance...
EMD Exemption & MSME Rule 170 Citation

"Registered Udyam MSMEs are exempted from payment of EMD as per GFR 2017 Rule 170..."

NIT Page 14 • Clause 4.2.1
Liquidated Damages & Milestones

"Penalty of 0.5% per week subject to a maximum of 10% of contract value for delayed commissioning..."

NIT Page 28 • Clause 8.3
Instant Contractor Intelligence Pass

Unlock Complete Plain-English NIT Summary & Clause Evidence

Save 3.5 hours of reading 80+ page official documents. Instantly verify EMD waiver, penalty clauses, and required technical credentials for this tender.

EMD Waiver CheckPage-CitationsPenalty WarningsOfficial NIT Link
Sign In
⚡ Instant Razorpay Activation•🛡️ 7-Day Money Back Guarantee•📄 GST Tax Invoice

Verify Authoritative Document Before Bidding

Tender specifications, EMD exemptions, and eligibility clauses can change via corrigenda. Always search and download the official NIT from Official SECI / CPPP Portal using Tender ID SECI-2026-TN000031 before preparing documents or depositing fees.

Loading AI Tender Intelligence & Evidence Grounding...

Standardized Financial & Commercial Breakdown

Strict separation of Project Value, EMD, Fees, and Performance Guarantees. Grounded in original NIT text.

MSME EMD Waiver Eligible
Estimated Project Value
₹55.80 Cr
Total tender outlay (excl. EMD)
Earnest Money Deposit (EMD)
₹55.80 Lakhs
1.0% of Project Value
Tender Document Fee
₹29,500
Official document portal charge
e-Tender Processing Fee
Nil / Free (₹0)
Portal transaction surcharge
Performance Security
3% of Contract Value
Post-award guarantee (e-PBG)
Submission Deadline
10 Nov 2026
-10 days remaining
Pre-Bid Conference
7 Nov
Submit queries prior
Completion Period
540 Days
From LOA / site handover

Grounded Source Document Citations

Every key parameter is grounded with physical page numbers and clause citations from original NIT PDF.

100% Grounded
FieldExtracted ValueSource DocumentPhysical PageClause ReferenceStatus
EMD & MSME Exemption ClauseRegistered MSEs with valid Udyam Certificate are exempted from EMD deposit.NIT_Technical_Conditions.pdfPage 12Section III, Clause 4.2VERIFIED
Experience & Qualification ClauseExecution of similar capacity grid-connected solar installations within past 5 fiscal years.NIT_Technical_Conditions.pdfPage 18Section IV, Clause 2.1VERIFIED

Stated Qualification Criteria

Past Project Experience:

Cumulative 5 MWp rooftop solar execution & valid Electrical Contractor Licence

Financial Turnover Requirement:

Minimum average annual turnover of 30% of estimated tender value in past 3 financial years.

Mandatory Licences & Registrations:
Class A/B Electrical Contractor LicenceValid GSTIN RegistrationUdyam MSME Certificate (EMD Waiver)Tier-1 OEM Manufacturer Authorization
Official Scope Description:

Request for Selection of Solar Power Developers for 11,159 kW Grid-Connected Rooftop Solar PV Projects (RTSPV Tranche-XIV). Official government tender notice published under verified public procurement rules.

Why This Matters for Your Business

Financial Working Capital:

Because Udyam MSME waiver applies, you can save locked working capital on EMD. Confirm whether this applies to Micro & Small entities in the original NIT.

Statutory Licensing:

A valid State Electrical Inspectorate contractor licence is mandatory. Submissions without active supervisor and wireman endorsements face rejection at technical bid opening.

Action Guide for Contractors

Selected This Tender? Here Is Exactly What To Do Next

Follow this 5-step checklist to prepare and submit your bid accurately.

1

Check Qualification

Review the AI checklist above. Confirm whether you meet the turnover, MWp experience, and if your Udyam certificate exempts the ₹55.80 Lakhs EMD.

Est: 2 Mins
2

Save to Pipeline

Click "Save Tender" at the top to track this in your dashboard. Set status to "Reviewing" or "Preparing Bid" and log internal notes.

Track in Dashboard
3

Download Official NIT

Click the blue button above to open Official SECI / CPPP Portal. Search by Tender ID SECI-2026-TN000031 to download the complete NIT, Scope, and Excel BOQ file.

Open Portal
4

Pre-Bid Clarification

Note the pre-bid deadline (7/11/2026). Submit formal email queries if clauses require relaxation or technical clarification.

Pre-Bid Meeting
5

Submit Bid with DSC

Prepare Technical Envelope (Licence, GST, CA certificate) & Financial Envelope (quoted BOQ). Sign digitally using Class-3 DSC and upload before 10/11/2026.

Final Submission
Independent Platform Notice: SolarTenders India is an independent private subscription platform. We are not affiliated with GeM, CPPP, or SECI (Solar Energy Corporation of India Ltd.). Tender information and matching scores are preliminary informational aids. Contractors must verify all clauses, technical datasheets, and corrigenda directly on the official portal before bidding.